Skip to content
Building a Hobbit Hole
for humans
  • Home
  • About us
  • Our team
Uncategorized

A second time lapse

Posted on November 26, 2017 by Pablo

This one shows the plumbing installation and the slab sandwich.

http://buildingahobbithole.com/wp-content/uploads/2017/11/11-24.mp4
Pablo
View all posts by Pablo →

Post navigation

Older post
Slab sandwich
Newer post
The slab is done

Recent Posts

  • Picturing it
  • The foam begins
  • Shaping up
  • The slab is done
  • A second time lapse

Archives

  • February 2018
  • January 2018
  • December 2017
  • November 2017
  • October 2017
  • September 2015
© 2025 Building a Hobbit Hole
Powered by WordPress | Theme: Graphy by Themegraphy