The slab is done

Last week, the slab was poured in two days. It was colored tan with a powdered color hardener and then stamped to look like wood. Later on, it will get more coloring, grout and a sealant. This floor will be indestructible. We left a space for the shower – it will be tiled and needs to slope to the drain.