Skip to content
Building a Hobbit Hole
for humans
  • Home
  • About us
  • Our team

Month: January 2018

Uncategorized

The foam begins

Posted on January 18, 2018 by Pablo

The foam that helps form the shotcrete is being installed and there is a lot of work on the retaining wall in front of the building. At the same time, fixture b...

Recent Posts

  • Picturing it
  • The foam begins
  • Shaping up
  • The slab is done
  • A second time lapse

Archives

  • February 2018
  • January 2018
  • December 2017
  • November 2017
  • October 2017
  • September 2015
© 2025 Building a Hobbit Hole
Powered by WordPress | Theme: Graphy by Themegraphy